0.8—2.5×550mm Continuous Galvanizing Production Line

      Project Name: 0.8—2.5×550mm Continuous Galvanizing Production Line

      Customer Name:Bazhou Zhuocheng Hardware Products Co., Ltd

      Project Nature: New Construction 

      Contracting Means: Generally Contracted by Beijing JJRS Technology Development Co., Ltd.

      Signing Date: on August 6, 2013

      Production Status: Has been put into Production

      Operation status: Good


      一、Basic  Parameters:

      Product specification

      Steel type:Ordinary Carbon Structural Steel 

      Material:Q235、Q195、Q215、08AL

      Steel Coil:Inner Diameter: 508 mm, Outer Diameter. 800-1800 mm

      Coil Weight:Max.8000Kg  

      Steel Strip Size: 0.8~2.5mm in Thickness

      Width:350-550mm

       Raw Material Specifications

      Material:Q235、Q195、Q215、08AL

      Thickness: 0.8-2.5mm

      Width:350-550mm

       Roll Weight:Max 8000Kg

      Steel Coil:Inner Diameter: 508 mm, Outer Diameter. 800-1800 mm

       Production Line Process Parameters

       Process Speed: 36-112m/min ,TV value is 90

      Looping Filling Speed: 130% of the Process Speed

      Drive System Power Configuration:AC Frequency Conversion Speed Regulation

      Adjustment Range of zinc coating thickness:35-200g/㎡ (Double-sided) Air Knife Adjustment

      Zinc Coating State: Normal Zinc Spangle, Small Zinc Spangle, Zinc - free Spangle

      Passivation Method:Dip Coating Passivation

      Product Quality Standard: GB/T2518-2008

      Production Line Direction: From Left to right (viewed from the operating side)

      一、 The technological process and equipment function describe the main equipment, which is arranged as follows according to the technological process:

       Configuration Equipment at the Entrance Section:

      1, 2# coil loading cart→ 1, 2# pay-off reel → 1, 2# scraper of pay-off reel → pinch roll after pay-off reel → five-roller pinch straightening machine → hydraulic cross-cutting shear → welding platform → 1# tension bridle roll → entry loop (three automatic aligning machines) → 2# tension bridle roll → 1# double roll aligning machine(CPC) → tension measuring machine → annealing furnace → furnace nose → zinc pot → sink roll → air knife → air cooling device→ high tower aligning machine → high tower steering roll → quench tank → squeezing roll → 2# double-roll aligning machine (CPC) → 3# tension bridle roll → tension leveler → 4#tension bridle roll → dip coating passivation → drying device after passivation→ exit loop ( 1 automatic aligning machine) → 5# tension bridle roll → hydraulic cross-cutting shear →pinch roll after coiler (guide plate) →coiler (EPC) → unloading cart

      Continuous Operation is Achieved Through the Electrical Control System, Hydraulic System, Pneumatic System and Auxiliary Equipment.