Project name: Chifeng Yuanlian Phase 4 annual output 112 tons of galvanized aluminum and magnesium unit (three L-shaped furnace units)
Customer name: Chifeng Yuanlian Iron and Steel Co., Ltd
Project nature: new construction
Construction method: Jingjie Ruisi general contracting
Signing time: December 2023
Production: 0.5-3.5x1050mm zinc-aluminum-magnesium production lines have been put into operation, and 0.3-2.0x1050mm, 0.3-3.0x1050mm zinc-aluminum-magnesium production lines are under construction
Operating conditions: TV value 150m/min