750mm Continuous Galvanizing Production Line

      750mm Continuous Galvanizing Production Line

      Project Name: 1.0—3.0×750mm Continuous Galvanizing Production Line

      Customer Name:Bazhou Zhuocheng Hardware Products Co., Ltd

      Project Nature: New Construction

      Contracting means: Generally Contracted by Beijing JJRS Technology Development 

      Co., Ltd.

      Signing date: on August 6, 2013

      Production Status: Has been put into Production (2016)

      Operation status: Good

      一、Basic  Parameters:

      Product specification

      Steel type:Ordinary Carbon Structural Steel

      Material:Q235、Q195、Q215、08AL

      Steel Coil:Inner Diameter: 508 mm, Outer Diameter. 800-1800 mm

      Coil Weight:Max.10000Kg

      Steel Strip Size: 1.0~3.0 mm in thickness

      Width:450-750mm

      Raw Material Specifications

      Material:Q235、Q195、Q215、08AL

      Thickness: 1.0-3.0mm

      Width:450-750mm

       Roll Weight:Max10000Kg

      Steel Coil:Inner Diameter: 508 mm, Outer Diameter. 800-1800 mm

      Production Line Process Parameters

       Process Speed: 27-90m/min ,TV value is 90

      Looping Filling Speed: 150% of the Process Speed

      Drive System Power Configuration:AC Frequency Conversion Speed 

      Regulation

      Adjustment Range of Zinc Coating Thickness:35-200g/㎡ (Double-sided) Air Knife 

      Adjustment

      Zinc Coating State: Normal Zinc Spangle , Small Zinc Spangle, Zinc - free Spangle

      Passivation Method:Dip Coating Passivation

      Product Quality Standard: GB/T2518-2008

      Production Line Direction: From right to left (viewed from the operating side)

       The Technological process and equipment function describe the main equipment, which is arranged as follows according to the technological process:

       Configuration equipment at the entrance section:

      1, 2# coil loading cart→ 1, 2# pay-off reel → 1, 2# scraper of pay-off reel → pinch roll after pay-off reel → five-roller pinch straightening machine → hydraulic cross-cutting shear → welding platform → 1# tension bridle roll → entry loop (three automatic aligning machines) → 2# tension bridle roll → 1# double roller aligning machine(CPC) → tension measuring machine → annealing furnace → furnace nose → zinc pot → sink roll → air knife → air cooling device→ high tower aligning machine → high tower steering roll → quench tank → squeezing roll → 2# double-roll aligning machine (CPC) → 3# tension bridle roll → tension leveler → 4#tension bridle roll → dip coating Passivation → drying device after Passivation→ exit loop ( 1 Automatic Aligning Machine) → 5# tension bridle roll → 

      hydraulic cross-cutting shear →pinch roll after coiler (guide plate) →coiler (EPC) → unloading cart

      Continuous Operation is Achieved through the Electrical Control System, Hydraulic System, Pneumatic System and Auxiliary Equipment.